Hi folks!
Here's Aust Govt Office of Best Practice Regulation website -
http://www.finance.gov.au/obpr/about/
The docs available there go the issue of determining Effective
Regulation - and might be of relevance to our GNSO Priority process
Example of the thinking:
Determining whether regulation meets the dual goals of 'effectiveness'
and 'efficiency' requires a structured approach to policy development
that systematically evaluates costs and benefits.
* The problem to be addressed and the related policy objective
should be identified as first steps in the policy development process.
* The consideration of a range of options for achieving the
objective (as well as a 'no action' or status quo option).
* An analysis of the likely economic, social and environmental
consequences.
* The policy development process should at least ensure that the
benefits to the community of any regulation actually outweigh the costs,
and give some assurance that the option chosen will yield the greatest
net benefits.
Another example comes from an Industry Self-Regulatory body in the Comms
sector in Australia - might be useful for staff...
http://www.commsalliance.com.au/__data/assets/pdf_file/0010/1252/Operati
ng_Manual_June_2007.pdf
Cheers
Rosemary
________________________________
From: owner-gnso-wpm-dt@xxxxxxxxx [mailto:owner-gnso-wpm-dt@xxxxxxxxx]
On Behalf Of Liz Gasster
Sent: Saturday, 21 November 2009 8:01 AM
To: gnso-wpm-dt@xxxxxxxxx
Subject: [gnso-wpm-dt] Introduction to draft Work Prioritization model
Work Prioritization Team:
As a way to help bring everyone to the same level on the GNSO Work
Prioritization project, I have attempted to consolidate various emails
and organize our latest thinking into a single document. Again, this
is a suggested draft starting place offered by staff and the group is
encouraged to modify it as you feel appropriate. There are three
sections as follows:
1) Recommended construct and methodology (see also attached
spreadsheet)
2) Draft definitions for two dimensions
3) Procedural questions to be considered
1) Recommended construct and methodology
For this effort, Staff is envisioning a two dimensional matrix or chart
(X,Y) to help the GNSO Council graphically depict its work
prioritization. This concept is based on having each discrete project
rated on two dimensions: Value/Benefit (Y axis) and Difficulty/Cost (X
axis). Section 2 below outlines the preliminary draft definitions for
each dimension (or axis), so we will concentrate in this section on what
the chart means, how it would be produced, and the rating/ranking
methodology including sample instructions.
Illustration: The chart below shows 8 illustrative projects (simply
labeled ABC, DEF, GHI, etc.) plotted on two dimensions: Value/Benefit
(Y axis) and Difficulty/Cost (X axis). In this sample depiction, Q1,
Q2, Q3, and Q4 represent four quadrants which are drawn at the midpoints
of each axis (arbitrarily set to 10). Thinking about Value/Benefit
versus Difficulty/Cost, Q1 includes those projects that have the highest
value and lowest cost; whereas, Q4 would contain projects with the
lowest value and highest cost. Project ABC, in this example, is ranked
3.25 on Difficulty and 7.75 in Value; therefore, it is located squarely
in Q1. Conversely, project GHI, is rated 7.75 on Difficulty, but only
1.00 on Value and is thereby placed in Q4.
How do the projects end up with these individual X, Y coordinates that
determine their placement on the chart?
There are several options for rating/ranking individual projects. We
will look specifically at two alternatives below:
Rating Alternative A:
One option is to ask each Council member, individually and separately,
to rate/rank each project on both dimensions. Even with this
alternative (and B following), there are different methods possible, for
example, (1) place a ranking from 1 to n for each project under each
column, or (2) use something a bit simpler, e.g. High, Medium, and Low
to rate each project relative to the others. Since it is arguably
easier to rate each project as H, M, or L versus ranking them discretely
from 1 to n, we will illustrate the former approach here. Keep in mind
that an ordinal ranking methodology would simply substitute a number
(from 1 to 8 in our example) instead of the letters H, M, or L.
Directions: Rate each project on a scale of HIGH, MEDIUM, or LOW for
each dimension (Value/Benefit, Difficulty/Cost), but keep in mind that
the rating should be relative to the other projects in the set. There
are no fixed anchors for either dimension, so raters are asked to group
projects as LOW, MEDIUM, or HIGH compared to each other. A HIGH
ranking on Value simply means that this project is perceived to provide
significantly greater benefit than projects ranked as MEDIUM.
If there are 20+ raters, we could provide a simple blank matrix and ask
them to provide their individual scorings. For example, assume that
the matrix below is one individual's ratings for all 8 illustrative
projects:
PROJECT
VALUE/BENEFIT
DIFFICULTY/COST
ABC
L
H
DEF
L
M
GHI
H
L
JKL
M
M
MNO
L
L
PQR
H
H
STU
M
M
VWX
M
L
Once we have all results submitted (could be simple Word, Excel, or even
Text Email) from all individual raters, Staff would convert each LOW to
a Score of 1, MEDIUM = 5.5, and HIGH = 10 (see attached spreadsheet,
Rankings tab). We would then average the rankings for all raters and
produce a chart as shown in the attached spreadsheet (see Summary tab).
Note: We only used 4 raters in the spreadsheet for illustrative
purposes, but it is trivial to extend to as many raters as we decide to
involve.
Rating Alternative B:
Instead of asking each Council member to rate/rank each project
individually, the Council could use a grouping technique (sometimes
referred to as "DELPHI"). For example, suppose we set up 4 teams based
upon existing Stakeholder Group structures as follows:
Team1: CSG = 6
Team2: NCSG = 6
Team3: RySG (3) + RrSG (3) = 6
Team4: Others (NCA, Liaison) = 4-5
Using this approach, we would have 4 small teams and we would ask for a
single CONSENSUS score sheet from each one (whether ordinally ranked or
rated H, M, or L). Then, we would average those results to produce the
overall chart (similar to the example in the spreadsheet). We should
make it clear that we are discouraging teams from individually rating
and averaging their own results. The benefit, from this modified
DELPHI approach, is that individuals (especially new Council members)
can learn from each other and develop, collectively, what they think the
most appropriate answer should be.
The above methodologies are subject to further discussion. Ultimately,
the Council will need to decide:
1) What work prioritization construct should be utilized (we have
suggested a simple two dimensional Risk/Cost vs. Value/Benefit displayed
in a four quadrant model)?
2) How should it be executed, e.g. participation, consensus ranking
(Delphi), individual ratings averaged, etc.?
2) Draft definitions for the X, Y dimensions
Staff proposes the following starting definitions for the axes in this
conceptual model.
X - Difficulty/Cost ... this dimension relates to perceptions of
complexity (e.g. technical), intricacy (e.g. many moving parts to
coordinate), lack of cohesion (e.g. many competing interests), and,
therefore, overall cost/time to develop a recommendation. We could have
- but chose not to - create a third axis to indicate the amount of time
required. This adds complexity and we decided that initially we would
include the concept of time into the definition for level of difficulty.
Y - Value/Benefit ... this dimension relates to perceptions of benefit
to ICANN and its stakeholders in terms of internet growth/expansion,
enhancing competitiveness, increasing security/stability, and improving
the user experience.
Please feel free to word-smith the above descriptions...
3) Procedural questions to be considered
Once the matrix is developed and all projects plotted, what should the
Council do with the results? This is an important question to answer
BEFORE the rating/methodology are finalized and executed.
The Council should discuss and decide questions such as:
1) How often should it be exercised and/or what event triggers an
analysis?
2) What decisions or outcomes are expected from the process?
Please let me know if we can provide any additional assistance prior to
and during the upcoming conference call on Monday.
Thanks and regards,
Liz
<<<