Ken and all,
pls. see my comments inserted.
The results of the prioritization exercise becoming mathematically exact is
beyond my expectation. The existing scaling appears to make this happen. But
during the prioritization process the entire council shall undertake there will
be some parameters having major impact on the results, like:
- different project understanding
- different "value" understanding
- opinion quality vs financial expenditure and others
So a qualitative scaling method (not limited) may be easier to handle the
prioritization chart as a tool for council decision making. E.g.: none, low,
medium, high, extreme or similar.
Looking forward for the discussion lateron
Wolf-Ulrich
_____
Von: owner-gnso-wpm-dt@xxxxxxxxx [mailto:owner-gnso-wpm-dt@xxxxxxxxx] Im
Auftrag von Gomes, Chuck
Gesendet: Samstag, 30. Januar 2010 02:31
An: Ken Bour; gnso-wpm-dt@xxxxxxxxx
Betreff: RE: [gnso-wpm-dt] WPM: Preliminary Thoughts in Preparation for Step 6
Thanks Ken. Please see my comments below.
Chuck
_____
From: owner-gnso-wpm-dt@xxxxxxxxx [mailto:owner-gnso-wpm-dt@xxxxxxxxx] On
Behalf Of Ken Bour
Sent: Friday, January 29, 2010 7:18 PM
To: gnso-wpm-dt@xxxxxxxxx
Subject: [gnso-wpm-dt] WPM: Preliminary Thoughts in Preparation for Step 6
WPM Team Members:
In preparation for next Tuesday's session (2 Feb 2010; 1700 UTC) in which we
are scheduled to discuss Step 6--Developing a Project Prioritization, I have
been thinking about this topic for several days and working through various
analyses of the model data generated thus far. While I do not have specific
recommendations to offer the team, a few principles and questions are beginning
to take shape. I thought I would share some of this thinking ahead of time for
those who have time to review and consider how the team can apply what has been
accomplished to date toward the ultimate objective.
NOTE: I apologize in advance that this material is dense in places. Please do
not attempt to digest it when you are stressed, preoccupied, and/or
multi-tasking which, I know, is the normal condition for ICANN volunteers and
Staff alike. J
As we discussed briefly on our call last Tuesday, the process of converting
from the two-dimensional matrix/chart to a one-dimensional prioritization is
not necessarily straightforward. To see why, let's start with a current
picture of the DELPHI project placements on our 7-point scale chart.
Accepting our definitions for X and Y and without making any unwarranted
assumptions, one set of interpretations from the four quadrants is as follows
(ignore the red dashed line for the moment):
Q1 = High Value, Low Resources à Inarguably, these projects should have the
highest priority to commence or proceed.
Q4 = Low Value, High Resources à Similarly, these projects are obvious
candidates to be stopped, slowed down, or postponed. [Note: As can be
observed from the chart, the team's test ratings did not produce any clear Q4
cases. At the risk of "retrogressing" on a point (following Jaime's insightful
lead), if high cross-correlation occurs between Resources Needed and
Value/Benefit, it is easy to predict that Q4 will be unpopulated. If that
result can always be expected, it begs the question whether this model is the
correct one for a project prioritization task. Normally, X and Y must be
INDEPENDENT variables in order to make a 4-Quadrant model work as theoretically
designed]. [Gomes, Chuck] Note that IRTB is on the border of Q4. But even if
it was in Q4, we are required to review the IRT Policy by previous decisions
made so I don't think we could eliminate it; at most all we could do is slow it
down, although in this case I think it has already been slowed down.
Q2 = High Value, High Resources à On the surface (arithmetically), these
projects are no more important in terms of priority than those in Q3 as long as
the numerical scale (1-7) is essentially the same between Value and Resources.
[Note: if that conclusion is not immediately obvious, I will shed more light
on it further into this discussion]. [Gomes, Chuck] I don't follow you here
at all. It does may me start to question the usefulness of this model though.
Could one of the problems be that we are counting resources and value
equivalently. It seems to me that value is more important than resources
needed except in cases where resources needed exceed resources available. So
maybe we need to add a step in the process that estimates availability of
resources; if that was doable, then we could focus mainly on the value/benefit.
Another way to approach it would be to rank value/benefit and then assign
resources in order from highest value to lowest up to whatever limits we have.
[WUK: ] I agree to Chuck. I understand the scaling more in qualitative sense
rather than quantitatively since the parameters to be scaled are different from
each other.
Q3 = Low Value, Low Resources à (the converse of Q2)
We are left, then, with two quadrants that produce relatively clear
action-strategies and two buckets in which the results are ambiguous. How
might we resolve the Q2/Q3 issue?
One straightforward approach is to take the rating results for Value/Benefit
and multiply them by Resources Needed and then sort by those products. A
project that is rated 7 on Value/Benefit and 7 on Resources Needed (i.e. not
needed) is the maximum result (7 * 7 = 49) we could achieve with this scaling.
First, we must recognize that "Far Below Average" Resources Needed is a
positive result, but we assigned it the value of 1 (lowest on the scale) for
convenience. In order to make the math work properly, we have to reverse all
of the X values by subtracting them from 8. So, TRAV is rated Y=2, X=2 on the
chart, but Resources Needed would actually count as a 6 if we had reversed the
scale when rating originally. To save everyone the arithmetic exercise, the
table below shows the conversions.
X Scale
Far Below
Moderately Below
Slightly Below
Average
Slightly Above
Moderately Above
Far Above
Original
1
2
3
4
5
6
7
Reversed
7
6
5
4
3
2
1
If we take all of the project DELPHI scores for Y and X (converted) and
multiply them together we get the following ranking:
Project
Resources
Value
R-Converted
(R-C)*V
Rank
STI
2.0
6.0
6.0
36.0
1
JIG
3.0
5.0
5.0
25.0
2
CCT
3.0
5.0
5.0
25.0
2
WG
4.0
6.0
4.0
24.0
4
GCOT
4.0
5.0
4.0
20.0
5
IRD
4.0
5.0
4.0
20.0
5
IDNF
3.0
4.0
5.0
20.0
5
PDP
5.0
6.0
3.0
18.0
8
RAA
5.0
6.0
3.0
18.0
8
CSG
5.0
5.0
3.0
15.0
10
PED
4.5
4.0
3.5
14.0
11
GEO
1.0
2.0
7.0
14.0
11
IRTB
4.0
3.5
4.0
14.0
11
ABUS
5.0
4.0
3.0
12.0
14
TRAV
2.0
2.0
6.0
12.0
14
Note: The column labeled "R-Converted" contains the adjusted X values by
taking each original score and subtracting it from 8.
Toward the bottom of the list (Rank=11), notice that PED, GEO, and IRTB all
have the same score (14.0) even though they occupy very different spatial
locations on the chart (Q2 and Q3). Similarly, ABUS and TRAV (Rank=14) have
the same result while being in opposite quadrants. As mentioned earlier in the
narrative, this apparent anomaly occurs because of the scale equality between
Value/Benefit and Resources Needed. [Gomes, Chuck] As mentioned above, I think
this may be a problem. Since the same 1-7 point scale is used for both
dimensions (equally weighted), a 2 on Value/Benefit has the same effect as a 2
on Resources Needed (after conversion). Given a single rating scale for both
dimensions, theoretically, we should be ambivalent in choosing between a
project that is Far Above Average on Value/Benefit (Rating=7) and one that is
Far Below Average on Resources Needed (Converted Rating=7). On the other hand,
some team members may perceive that a project with HIGH Value/Benefit is more
important than one having comparably LOW Resources Needed and, thus, would give
a higher priority to PED and ABUS even though GEO is actually tied with PED and
scores higher than ABUS! I will take up that question a bit further into the
analysis...
How might we remedy this ambivalence between Q2/Q3?
One way to resolve this problem is to consider a straight line that starts at
1,1 and goes to 7,7 (see red dashed line in above chart). Any project whose
Value/Benefit is >= Resources Needed is considered in the ACCEPT area and any
project whose Value is < Resources is in the QUESTIONABLE region. One
interpretation is that projects in the QUESTIONABLE region, relatively
speaking, are consuming more resources than the value they are generating and
are candidates for being reevaluated. In terms of relative priority, those
points furthest from the red line are the least important projects. [Gomes,
Chuck] Do you mean furthest below the red line? ABUS would be the lowest
ranked project using this approach. [Gomes, Chuck] I think this idea may be
promising but there are some anomolies. Note: the IRTB is below the line but
it is a required task; FF is above the line and may be one of the least
important tasks because at best it could produce some best practices. Should
PDPs have more value than non-PDPs? I don't know but maybe.
Another possibility is to develop a weighting system for Value/Benefit that is
different from Resources Needed, that is, alter the scales to accord more/less
weight to Y than X. Incidentally, although it may seem to be an obvious
solution, multiplying either series by a constant number (e.g. 4 for Y and 2
for X) will produce identical project rankings. Said another way, the X/Y
dimension weights cannot be simple multiples of each other. To illustrate an
approach that would produce a unique ranking, suppose (see table below) we
decided to use a Fibonacci series (remember the SCRUM discussion back in
mid-December?) for the Y weights (starting arbitrarily at 2) and a straight
linear weighting for X matching the original scale.
Y-Scale
Y-Weight
X-Scale
X-Weight
1
2
1
1
2
3
2
2
3
5
3
3
4
8
4
4
5
13
5
5
6
21
6
6
7
34
7
7
If we multiply these series together, it produces a prioritization shown in the
table below. The column labeled "V*C"[Gomes, Chuck] Do you mean "V*R"?
contains the product of the weighted results.
Project
Resources
Value
R-Converted
V-Wgt
R-Wgt
V*R
Rank
STI
2.0
6.0
6.0
21.0
6.0
126.0
1
WG
4.0
6.0
4.0
21.0
4.0
84.0
2
JIG
3.0
5.0
5.0
13.0
5.0
65.0
3
CCT
3.0
5.0
5.0
13.0
5.0
65.0
3
PDP
5.0
6.0
3.0
21.0
3.0
63.0
5
RAA
5.0
6.0
3.0
21.0
3.0
63.0
5
GCOT
4.0
5.0
4.0
13.0
4.0
52.0
7
IRD
4.0
5.0
4.0
13.0
4.0
52.0
7
IDNF
3.0
4.0
5.0
8.0
5.0
40.0
9
CSG
5.0
5.0
3.0
13.0
3.0
39.0
10
PED
4.5
4.0
3.5
8.0
3.0
24.0
11
ABUS
5.0
4.0
3.0
8.0
3.0
24.0
11
GEO
1.0
2.0
7.0
3.0
7.0
21.0
13
IRTB
4.0
3.5
4.0
5.0
4.0
20.0
14
TRAV
2.0
2.0
6.0
3.0
6.0
18.0
15
Using this method, TRAV is the lowest ranked project followed by IRTB, GEO, and
ABUS.
There are myriad possibilities for weightings that could be applied to X and Y
differently, but I will stop here since the first step would be to develop a
rationale for such treatment. Once a justification is produced as to why Y
should be weighted higher than X (or vice versa),[Gomes, Chuck] I think this
could be justified as noted above. it is much easier to create a numbering
scheme that supports it.
Another option, as suggested on last week's call, is to create a new
prioritization/ranking using the above information as INPUT. One could start
by ranking projects within quadrants, for example, Q1, then Q2/Q3
(challenging?!), and, finally Q4. If this is a viable option, a reasonable
question that might be asked is: Is it possible to rank all of the projects
from 1 to 15 (or n) without first exercising the X/Y modeling step? [WUK: ] If
you do it on a qualitative scale it should be possible. If the answer is YES,
then this entire process could be radically abridged. If NO, then the X/Y
modeling is a useful precursor to developing rankings within quadrants. [Note:
a process needs to be developed for generating the individual quadrant
rankings, e.g. group Delphi?] [Gomes, Chuck] I am not convinced we need to
rank quadrants linearly. It might suffice to rank them in groups.
At this stage, Staff is neither leaning toward nor recommending any particular
solution, only exploring options and posing questions that the team may want to
consider in its ensuing deliberations.
Additional questions that might be productive to discuss as Step 6 unfolds:
· In what specific ways will a prioritized list of projects assist the
Council?
· Should the prioritization result in an unambiguous ranking from 1 to
n (no ties) or can projects be grouped into one or more buckets? [Gomes, Chuck]
I favor this as I said above.
· What decisions or outcomes does the team expect from executing the
rating/ranking/prioritization processes?
· How are new projects added to the list and incorporated into the
process in terms of evaluation/ranking?
· Since the rating process is relative, is it possible to slot a new
project into the matrix/chart without reevaluating all of the others at the
same time?
· How are changes to project status identified, recommended, approved,
and incorporated?
· What frequency should the WPM process be exercised (e.g. monthly,
semi-annually, annually) or, if ad hoc, what trigger events cause one to be
initiated?
Again, I apologize for the length and complexity of this email, but I thought
it might be helpful to document some of my ruminations prior to our next
session.
Regards,
Ken Bour
<<<